Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

For doing this, navigate to Rate Manager- Rentability set menu.

Image Removed

And this Rentability set needs  This rentability set (and its rules) need to have a Stay stay date in the future, preferably the period till which you want to opt for Pre-booking.

Image Added 


And the Representation has 4. This rentability set now needs to be linked to all required representations. The link dates are to show for which period you want to use this set for the particular representation(s).


5. To add the prebooking prices, you need to create a prebooking rate option. The Default Rate type needs to have a Rate option for Pre-booking, which can be created by navigating to the default rate type in the Rate Type menu in the Rate Manager, and creating a rate option as follows:

Image Added Image Added

Image Added


6. Add prices for all required accommodations, for the required period. Can be done in batch update as well, or in the Rates screen.

Image Added


7. Continue to make a reservation in Reservation Manager, where the accommodations show up marked as ‘Prebooking’- continue with the reservation, and it gets saved as Prebooking reservation.

Image Added