Before the Energy settlement can be started, some configuration has to be checked/added and data has to be given in:


Step 1: Reservation

A reservation should be available to charge guests for energy costs. The starting point of this functionality is, that guests stay in an accommodation or rent a camping spot and pay for their energy costs. Often it is about energy costs, but it could also be about the use of water and gas.

The status of the Reservation has to be Checked-in to be able to be shown in the Check-out module, where the meter reading entries are available.

Example:

  • Rented = camping spot "Winterplaats"
  • Unit = Season pitch Dennewei nr 681
  • Arrival =  
  • Departure =  .
  • Customer = Guest
  • Status = Checked-in

Step 2:

Usage

Create usage extra's

Per Utility Meter an extra should be created with the valid rates for calculation of the charges.

The charges will be calculated by rate x unit. So when the meter reading for energy will be kWh, the rate should be the price per kWh.

Note: On the extra used for this example, the check box "Invoice article" has been selected. This is because of the Energy settlement for owners. It did work fine for this example as well, but I don;t think it's necessary to have the check box selected for charging the guest for usage.

 


Step 3: Link invoice extra's to Utility bill

In Accommodations

types

(on Unit level) on the tab

Utility bill

Energy guest, the configured extra's with the right rates should be linked to the specific

Utility types

Meters.

The configuration

can

has to be done on

the highest level, as long as all extra's used for calculation should be the same for the underlying types and units.

The Utility types:

  • Energy
  • Gas
  • Water

will be used for the calculation per unit based on the meter readings given in on Meter reading tab.

The Utility types:

  • Admincostenergy
  • Admincostgas
  • Admincostwater

will be used for fixed costs.

The Utility type:

  • Admincost

will be used for deposit settlement in combination with an extra where the checkbox "Adjustment invoice extra" has been selected.

Image Removed

Step 4: Add meter readings

In Accommodations on the tab Energy, the meter readings have to be added.

To be ready to get started, the start value has to be added and marked as start value.

At the end of a settling period, the actual values have to be added. 

It's also possible to add meter readings on accommodation type level. When a list of meter readings is available, this will work much faster:

  • fill all readings per unit
  • calculate usage, based on the last value which can be found on accommodation level
  • store new readings. After this, the new values are visible on the accommodation energy tab.

Image Removed

Image Removed

Image Removed

Image Removed

Image RemovedUnit level.

The Meter name will be shown in Check-out as well, so should be clear to the user.

Image Added



Step 4a: Add meter readings in Accommodations

In Accommodations on Unit level on the tab Energy Guest, the first and following meter readings could be added. If this is done, the reservation will automatically show the start value. 


Image Added

Image Added


Step 4b: Add meter readings in reservation through Check-out 

The Start end End value could be added manually in the reservation through the Check-out module as well.

Once the end value has been added, the Startdate and Enddate are filled automatically, even as the Total usage and the costs of the corresponding extra per usage unit.

Image Added

Image Added